ASPM Notes









     Non union shop
     Shutdown processors per shift = 6
     Rust preventative is applied during shutdown to prevent molds from degrading. Requires more waste material during start up, but mold refinishing is more expensive and time consuming
     Ed is responsible for about 30 machines
     2-950 is hydraulic and needs to be run by hand when purging
     3-300 is servo driven and can be run automatically
     2-950 has a chiller that needs to be adjusted before shutdown
     330lbs drier, 100 lbs/hr = 3 hr dry time
     Beads from the bottom of the drier that may have collected moisture over a shutdown are emptied from the drier and placed back in the material container and run through the drier.
     Drier is less efficient at the bottom, so beads at the bottom may have absorbed moisture when the drier sits.
     Machines have a 5 shot rule, if more than 5 shots do not pass then technicians and supervisors are alerted
     Initial purge it required to finish cleaning out purgex and marlex because machine will not run if hopper is empty, leaving material in the barrel.
     3-300 has a heated manifold
     Mold needs to be flushed too because the hot manifold has plastic in it
     1st shot is a short shot
     Sheen on initial parts is from the rust preventative applied during shutdown
     The first 5 shots are usually ignored and scrapped
     8 shots to first good part, 15 min
     1 partial, 7 complete
     2 locations of purge material barrels, one set in the front and one set in the back. 1 barrel of each type
     2-950 has a chilled manifold
     Marlex used on start up to finish purging burnt PVC from barrel
     3 buckets were used until good, anywhere from 1-8 buckets can be used depending on how well it was cleaned on Friday
     Carbon forms in the machine and can break off at anytime, requiring more purge material.
     A lot of the start / stop in the purging process is based off operator judgement / experience and is heavily visual
     Start machine with a full shot
     8 shots until a good part, about 40 min

3-300 (Nylon)
-       From feeder off to last good part - 27.08.04
-       Purge material in to clean barrel - 35.50.09
-       Difference = 8.42.05

Solution
Journal
ASPM Notes
9/6 125 words
We went last Friday to the ASPM factory to see how all the operators do their work also to see how the 3-300 and 2-950 shutdown and I was recording everything with my phone and at that day we have met with the client to walk with us and let us meet with the operators
We went to the ASPM factory last Friday. We saw how operators worked and the shutdown of 3-300 and 2-950. I recorded these activities on my phone. Operators in the production line facilitated manufacturing and assemblage of machines, products, and food stuff. Production line operators were hired by manufacturing and packaging factories to work in flexible full time schedule. The production line workers were the main components of the factory and they reported their work to the floor supervisor. The production line operators performed the same task everyday and, they were the laborers who maintained the standard of products being manufactured at the factory. During a shutdown, the job and duties in the production line shifted.  The supervisors for maintenance were moved to the area of critical work. The engineers wee responsible to work as “owners’ representative”. The engineers managed contract work. Planners had a schedule of job duties. The critical paths were scheduled and progress was reported on daily basis. During shutdowns, there was unexpected work load.
9/8 125 Words
We went last Sunday to the ASPM factory to see how all the operators work and also to see how the 3-300 and 2-950 start-up and also, I was recording everything with my phone and also the Client was walking with us
On Sunday, we went to see how all operators worked and client was walking with us.  The operators were responsible for plant operations. They monitored and solved problems related to equipments. They loaded and unloaded material from railcars, and so on. They were responsible for housekeeping. The environment and safety standards were maintained by the operators. The operators designed, conceptualized, and implemented the project and showed improvements according to the demands of clients. The client was communicating with operators regarding the nature of product and relating the products to his demands. The process operators overviewed the process of manufacturing. They made sure that project is free of flaws. The process operators make sure that the quality and standard of products is maintained.  I made the video to present in the class.
9/10 (Day 5) 75 words
Our Advisor gave us a presentation
The advisor gave us a presentation regarding all service plastic molding (ASPM). It was explained that APSM manufactures injection molding. The injection molding process involves innovation and quality. The factory specializes in manufacturing of plastic products. There is assemblage of plastic products. There are more than ninety presses from 55 to 1,100 weights in tons. The factory is committed to provide excellence in all the manufactured goods. The factory has latest technology related to injection molding and complex processes and assemblies.  The students need to visit this factory, and narrate their experiences to the class in form of formal presentation and indulge in group discussions to make their knowledge more clearly to themselves.
Day5 - Post-Proposal
(1).ppt
Also we have met all together to collect all the date from our last two visits to the factory. We were a group of students who visited ASPM factory. We saw shutdown of operations and their starting up. Throughout our visit to the factory, the client was walking with us and sharing tiny mini details to remove any ambiguity we had in our minds.
9/12 125 words
In that class we had a Conference Call with the client to ask him some questions and also we was working on our weekly report in it was not individual cuz we didn’t do a lot of individual my Advisor told us that we can submit it as a group in this time
We had a conference call with the client to ask him some questions. We asked him about the injection molding expertise. The client told that the factory manufactures thin wall injection, gas assist, vacuum assist, long glass fiber, hot oil, sequential gate control, insert molding, two shot molding, in mold decorations, and so on. The client explained us uses of injection molding. Packaging bottle caps, wire spools, pocket comb, toys, small tables, mechanical parts, and many other useful products are made from injection molding. The client had a pleasant working experience with the factory. The standard of the products was same since 20 years.  The client shared how the factory keeps up with tough deadlines and schedules. The client was very cooperating and answered all of our questions.
Project Progress
Report 9.13.pdf
And also we were working on the Variables
There are two variables, independent and dependent. The independent variable is the production in a factory. This is under control and can be manipulated according to the benefit of the company or client. The independent variable influences the outcomes negative or positive. We have seen how the quality of products satisfied the client and profitable for factory and workers.  A variable is simply something which can be changed or modified.  The dependent variable is of key interest for the researcher or visitors. We visited the factory to search for dependent variable. We got to know that the dependent variable is the product, the independent variable is the standard and demand in manufacturing. The demands affect dependent variable i.e. product.
9/17 125 words
In that date we had our first presentation with our Advisors
Update 1 ASPM
Project.pdf
And my part was the problems and the( cause and effect ) And they gave us some notes that we need to be specifics and we need to put all the date that we have and some pic of the Factory
My part is cause and effect. In cause and effect relationship, we study the links between events and how events lead to outcomes. In the factory, we have seen that the equipments shut down were events and how job roles changed as a result of breakdown is effect. This is instance of cause and effect. In a factory, the client placed an order, the factory made products accordingly. The factory received more orders. This event i.e. manufacturing of goods, led to more orders and profits i.e. effect.  A visit to plastic factory was a cause or event which enhanced our knowledge regarding manufactured goods and clients’ experience, this is effect.  The cause and effect simply makes a relationship among events and their effects or consequences.
9/18 75 words
In this day we have met all together at the library from 8:00PM to 10:00 to analyze all the videos recording that we already have so in next class we have another Conference Call with the client
We met in the library to see all the videos from 8:00 pm to 10:00 pm. We had another conference call with the client. There were some loop holes and ambiguities regarding which we needed to call the client. The client answered all our queries. There was some confusion related to the process of manufacturing. The client explained that operations manager supervises that the products are made according to demands of clients and standards of the factory.
9/19 75 words
We have met all together to finish analyzing the videos and get ready for Conference Call with the client but he was busy so we moved it to 9/24/19
The client was busy on 9/18, so we scheduled a phone call on 9/19. There were some demands of the clients which he used to make related to the product. The client was explaining the specific demands he used to forward to the factory. The factory specifically designed those products for him. The client explained us the machinery used in manufacturing of his products. The client placed huge orders in the factory and the factory valued him.